Works:
- The planned execution period is 12 months.
- Private construction is expected to begin in an even shorter time frame.
Building regulations:
A strict building code is planned from the outset, prioritizing clear architectural and urban planning guidelines for the benefit of the neighborhood. Particular importance is given to good taste and construction quality, the use of high-quality natural materials, a minimum house area of 200 m², and ample front and side setbacks to ensure the quality and spaciousness of green areas alongside the shared areas.
Internal reference: Tera-41212